Handover inspection or snag list: which one you need, and when

The handover inspection is the walk with the developer, the snag list is your record of defects, an independent inspection sits between. When to do each.

By the Ajusteur team5 minute read

The handover inspection

When a new home is ready, the developer invites you to receive it. In practice that is a meeting at the unit with the handover team, a walk through the rooms, a set of documents to sign and the keys. Developers differ in how much time they give you and whether you may bring your own inspector. Ask both questions when the invitation arrives, and ask for the water, power and cooling to be on.

Treat the walk as your inspection, not theirs. The handover team is there to complete a process. You are there to see the home as it is on the day it becomes yours.

What you are usually asked to sign

A handover pack typically includes a document confirming you received the unit, a receipt for keys and access cards, and a form or system for recording snags. Read the receipt before you sign it. If it says the unit was received in good condition and free of defects, ask for your snag list to be attached or referenced, or for the wording to reflect that snags were recorded. If the developer runs its snag process through a portal or a call centre, note the reference numbers.

None of this changes the law. Under Dubai Law No. 6 of 2019 the developer stays responsible for defective installations for a year from handover and for structural parts for ten years from the completion certificate, whatever the receipt says, and clauses that cut those down are void. The signature matters for the record of what you saw, not for your rights. The periods are explained in what your developer must fix.

Source: Chambers and Partners: Construction defects in Dubai, legal remedies for new property owners

The snag list

The snag list is the written record: every defect, numbered, with its room, its exact location, one line of description and a photograph. It is what the developer's contractors work from, what you tick off as items are fixed, and what you keep when a conversation turns into a dispute. Keep it with your sales agreement, your floor plans and your specifications.

A snag list that works is specific. Not kitchen cabinets damaged but item 14, kitchen, third wall cabinet from the left, door scratched on the inner face. For the full method, read what is a snag list and how do you track it, and for the room by room checks, the snagging checklist.

Source: Designing Buildings: Snagging construction works

The independent inspection

An independent inspection is a visual review of the accessible parts of your home by someone who is not the developer and not you. It gives you a list you did not have to write while also managing a handover meeting, and it tends to find the things an untrained eye walks past: hollow tiles, reversed falls, a condensate drain with nowhere to go.

It is still a visual review. It does not certify the structure, the waterproofing or the electrical installation. A good report says plainly what was seen and what should be tested by a specialist, and keeps the two apart. That is how we define ours: the checklist is agreed for your home, specialist testing is identified separately, and repairs are not part of it. The starting scope is on the home inspection page.

Which one do you need, and when?

Three moments, three tools.

01
Before handover
Ask whether you can walk the unit before signing, with the services on. Bring an inspector if the developer allows it. Write the snag list on the day
02
At handover
Walk it again with the handover team, record new items, and make sure the receipt refers to your list or to the snag process
03
In the first year
Report everything in installations in writing as it appears, because that is the period the developer must fix them in. Keep the list live and tick items off as they are closed
04
After a renovation
The same walk, with your contractor's scope in hand instead of the developer's specification

Villas and renovations

Everything above applies to a villa, with more rooms, a roof, external walls and a garden drainage system to add. It applies after a renovation too, where the contractor replaces the developer and the written scope replaces the specification. How a renovation is planned and closed, down to the snag list at the end, is in how to plan a villa renovation in Dubai.

How we can help

Tell us the situation, before handover, after a renovation or when something feels off, and your location. We confirm the scope, the checklist, who will carry out the inspection and the fee before booking. You receive a room by room record with photographs where access allows, and a clear note of anything that needs a specialist. Start on the home inspection page, or read how a project runs.

Quick questions

Can I bring my own inspector to the developer's handover?

Many developers allow it, some ask for notice. Ask when the handover invitation arrives, and ask for the water, power and cooling to be on.

Should I sign the handover document if there are snags?

Read what it says. Ask for your snag list to be attached or referenced, or for the wording to record that snags were noted. Your legal protections under Dubai law do not depend on the receipt, but the record of what you saw does.

What is the difference between a snag list and an inspection report?

A snag list is the numbered record of defects you hand to the developer. An inspection report is a third party's written account of what it saw, which you can use to write or check your snag list.

Sources

  1. Chambers and Partners: Construction defects in Dubai, legal remedies for new property owners
  2. Designing Buildings: Snagging construction works
Guides

Keep reading

All guides

Contact

Tell us about your project.

Start with an idea. Photos and measurements can come later.

Tell us about your project.

Start with an idea. Photos and measurements can come later.

How can we reach you?A phone number, an email, or both.
What is it about?
What would you like made, changed or checked?
Photos, documents and plansPhotos, PDF, Word or Excel. Up to 5 files, 5 MB each.
Add details (optional)
For example the community or building
When
What happens next
  1. We review your enquiry and respond using your contact details.
  2. We confirm availability and agree any visit or measurements needed.
  3. You review the scope, price and payment terms before agreeing to proceed.

We use your details to respond to this project and to plan the work.

Get in touch